Advance Kawabe Co., Ltd.

Company Profile

Address: 39-22 Ootakemachi, Nobeoka-shi, Miyazaki 882-0024
TEL: 0982-33-2887
FAX: 0982-33-2861
President: Masazumi Kawabe
Capital: 10 million yen
Established: February 1967 as Kawabe Tekkojo, June 1989 Advance Kawabe
Employees: 12
Factory scale: land area… 2,513㎡; building… 1,025㎡

Our specialization

  • Building construction
  • Steel structure construction
  • Tank, duct and pipe work
  • Machine and device installation
  • Cleaning facility construction
  • Electric instrument construction

Our Strength

We excel at steel frame structure, and have a wide range of work including environmental plants, amenity facilities, and tank, duct and pipe work.

Our motto is to be precise, prompt and cost effective, using our rich technical experience.

Environmental plants

  • Oversize garbage recycling facility design and fabrication for the City of Usuki
  • Oversize garbage disposal facility for the City of Kanoya
  • Ebino-shi Bika (cleanup) Center
  • Oversize garbage disposal facility for the City of Kawachi, Kagoshima Prefecture
    Device installation
  • Mining and other pollution prevention business for abandoned mines, FY 2009
    (Thickener facility installation work for abandoned mine, Misato-machi)
  • Mining pollution prevention business for abandoned mines, FY 2009
    (First phase of the neutralization facility installation work for abandoned mine, Misato-machi)
  • Maekawa intake dam outside hoist device (1 location) replacement (Miyazaki-ken Kigyo-kyoku)
  • Maekawa intake dam scour gate water leak prevention rubber lining replacement (Miyazaki-ken Kigyo-kyoku)
  • Kijino intake dam hoist device replacement (Miyazaki-ken Kigyo-kyoku)
  • Sabukawa dam intake gate hoist device replacement (Miyazaki-ken Kigyo-kyoku)
  • Takora intake dam scour gate repair work (Miyazaki-ken Kigyo-kyoku)
  • Watarigawa dam intake gate hoist device replacement (Miyazaki-ken Kigyo-kyoku)
  • Ayakita dam management office rear staircase installation (Takaoka Civil Engineering Office)

Pipe work

  • Kyushu FHP Phase III construction (large diameter piping)
  • Pipe system work for the new cleaning factory construction of the City of Nobeoka

Steel frame construction

  • Nobeoka-shi Gionmachi Arcade steel frame construction

Amenity facility

  • Kitagou-ku Nakagoya Astronomical Observatory
  • Green Pia Maki Golf Driving Range

Certified personnel and facility

  • First class architect: 1
  • Second class architect: 3
  • Industrial waste incinerator technical manager: 1